ANALISIS QUANTITY TAKE OFF STRUKTUR GEDUNG BERTINGKAT DENGAN METODE BUILDING INFORMATION MODELING (BIM)
Abstract
Full Text:
PDFReferences
F. Fakhri, R. Body, and R. Apdeni, “Pengembangan Media Pembelajaran Berbasis Animasi Pada Mata Kuliah Gambar Teknik Jurusan Teknik Sipil Universitas Negeri Padang,” CIVED, vol. 5, no. 4, 2019.
R. Apriansyah, “Implementasi Konsep Building Information Modelling (BIM) Dalam Estimasi Quantity Take Off Material Pekerjaan Struktural,” 2021.
F. J. López, P. M. Lerones, J. Llamas, J. Gómez-García-Bermejo, and E. Zalama, “A review of heritage building information modeling (H-BIM),” Multimodal Technol. Interact., vol. 2, no. 2, p. 21, 2018.
E. Widiasuti and S. T. Mochamad Solikin, “Analisa Perbandingan Volume Metode Konvensional Dan Building Information Modeling (Bim) Autodesk Revit 2021 Terhadap Efektifitas Biaya (Studi Kasus Proyek Pembangunan Rumah Susun Pekerja Industri Batang Iii Tower 10).” Universitas Muhammadiyah Surakarta, 2022.
Y. Marizan, “Studi Literatur Tentang Penggunaan Software Autodesk Revit Studi Kasus Perencanaan Puskesmas Sukajadi Kota Prabumulih,” J. Ilm. Bering’s, vol. 6, no. 01, pp. 15–26, 2019.
Refbacks
- There are currently no refbacks.
Diterbitkan oleh:
Lembaga Penelitian dan Pengabdian Masyarakat (LPPM)
Universitas Widyagama Malang
Jl. Borobudur 35 Malang
email : lppm@widyagama.ac.id
This work is Under licensed

Creative Common Attribution-ShareAlike 4.0 International (CC BY-SA 4.0)